Close

Solicita Más Información

Llena los campos descritos en la parte inferior y nos pondrémos en contacto.




We are Specialists

Know our services

WE TRANSPORT PROGRESS

We integrate solutions that contribute to the growth and strengthening of the electric transmission system, allowing the connection of new generation centers and the supply of electric energy to different users (industrial, commercial and residential). We meet the requirements of our Clients exceeding their expectations and we offer an excellent quality through highly qualified personnel and standardized processes.

WE TRANSFORM PROGRESS

We are one of the most experienced companies in the implementation of Electrical Substations of the Federal Electricity Commission, contributing to the transformation of electric energy to meet the needs of the end users. We work hand in hand with the Client, offering a personalized treatment, which favors the compliance in time and form of the Projects awarded. We are highly committed to the environment by generating sustainable strategies that benefit our environment.

WE CONTRIBUTE TO THE PROVITION OF A BETTER SERVICE

Through specialized equipment and the use of new technologies, we contribute to improve the infrastructure of the distribution of electric energy, and reduce technical and non-technical losses in the network. We demonstrate our high capacity of innovation and incursion in new markets, achieving it with a strong commitment.

In 18 years of continuous work

in Mexico and Central America.

we have executed 67 projects

resumed in:

Substations
LINE IN KM
Measurer
MVA TRANSFORMATION:
Networks (Km-C)

IMPACT

Projects

PROJECT “42 LT ASSOCIATED NETWORK OF THE TAMAZUNCHALE CENTRAL”.
TYPE OF PROJECT: TRANSMISSION LINES. 

Engineering, Procurement of Materials and Equipment for Permanent Installation, Training, Construction and Commissioning of 3 (three) Transmission Lines with 400 kV voltages and a total length of 397.1 km-C and 3 (three) substations with voltages of 400 And 230 kV, with a total capacity of 375.0 MVA, 233.3 MVAr of the inductive type and 12 (twelve) feeders, to be located in the States of Hidalgo, Querétaro and San Luis Potosí of the United Mexican States.

PROJECT “274 SE 1620 DISTRIBUTION VALLE DE MEXICO” (1st stage)
TYPE OF PROJECT: ELECTRICAL SUBSTATIONS

Engineering, Search for Materials and Equipment for Permanent Installation, Training, Construction and Commissioning of 7 transmission lines with 230 and 85 kV voltage and a total length of 16.8 km-C and 10 substations with voltage of 230, 85 and 23 KV, with a capacity of 780 MVA and 46.8 MVAr of compensation and 123 feeders in High Voltage, that were located in the Federal District and the State of Mexico, of the United Mexican States.

PROJECT “322 SLT 1921 REDUCTION OF ENERGY LOSSES IN DISTRIBUTION” (4TH PHASE).
TYPE OF PROJECT: REDUCTION OF LOSSES.

Execution of all works necessary for the construction and installation of 10 (ten) works: 6 (six) loss reduction works with a voltage of 23 kv, a total capacity of 102.42 mva of transformation and construction of 427.54 km-c of line; And four (4) measurement assurance works. These works involve the withdrawal, supply and installation of 250,522 meters ami type with any type of communication; Which were located in the federal district and state of mexico, mexican united states. Includes engineering, supply, construction and testing activities.

Review the

News of Edemtec

Some of our

Customers

Contact us

CEO

Av. General Mariano Escobedo No 510, piso 7, Col. Nueva Anzures, Del. Miguel Hidalgo, CP 11590, Ciudad de México

PBX (55) 55 31 29 29

FAX (55) 55 31 29 30